(Bloomberg) -- BP Plc said divers completed an
inspection of the damaged CATS natural gas pipeline in the North
Sea and a permanent repair will be required before the pipeline can
resume operating in September.
``A metal sleeve will be installed to strengthen and protect
the affected area of pipeline,'' BP said in an e-mailed statement
today. ``Design and fabrication of the sleeve is already under way
and it is expected that the system will restart during September.''
Read more at Bloomberg Energy News
inspection of the damaged CATS natural gas pipeline in the North
Sea and a permanent repair will be required before the pipeline can
resume operating in September.
``A metal sleeve will be installed to strengthen and protect
the affected area of pipeline,'' BP said in an e-mailed statement
today. ``Design and fabrication of the sleeve is already under way
and it is expected that the system will restart during September.''
Read more at Bloomberg Energy News
No comments:
Post a Comment